Test plan

Scope, approach, schedule, risks, entry/exit criteria. IEEE 829-style structure.

640 wordsIEEE 829ReleasePlanning

Test Plan — Product Name v0.0

Document ID: TP-XXX Author: Name Date: YYYY-MM-DD Status: Draft / Review / Approved


1. Introduction

1.1 Purpose

State what release, feature set, or test cycle this plan covers and why it exists.

1.2 Scope

In scope:

  • Feature or component 1
  • Feature or component 2

Out of scope:

  • Excluded area — reason

1.3 References

  • PRD / user story link
  • Previous test plan (if applicable)

2. Test Objectives

List what testing will confirm or measure. Use numbered points.

  1. Objective 1
  2. Objective 2

3. Testing Approach

3.1 Test Types

Type Scope Owner
Smoke Scope Role
Regression Scope Role
Exploratory Scope Role
Performance Scope Role
UAT Scope Role

3.2 Test Techniques

Describe the design techniques to be used: equivalence partitioning, boundary value analysis, exploratory charters, etc.


4. Entry and Exit Criteria

4.1 Entry Criteria

  • Build deployed to test environment
  • Smoke suite passes with 0 blockers
  • Test data prepared and verified

4.2 Exit Criteria

  • ≄ X% of planned test cases executed
  • 0 open Critical or High severity defects
  • Regression pass rate ≄ X%
  • UAT sign-off obtained

5. Environments and Test Data

Environment URL / Details Owner
Test URL Name
Staging URL Name

Describe test data sources and how data will be set up / torn down.


6. Schedule and Milestones

Milestone Target Date Owner
Test planning complete Date Name
Test case review Date Name
Test execution start Date Name
Automation run complete Date Name
UAT Date Name
Test summary report Date Name
Go / no-go decision Date Name

7. Risks and Mitigations

Risk Likelihood Impact Mitigation
Risk description High / Medium / Low High / Medium / Low Mitigation plan

8. Roles and Responsibilities

Role Name Responsibility
QA Lead Name Planning, reporting, stakeholder communication
QA Engineer Name Test design and execution
SDET Name Automation and performance tests
Product Owner Name UAT sign-off
Dev Lead Name Defect triage and fix delivery

9. Deliverables

  • Test cases in test management tool
  • Daily status updates in channel
  • Test summary report
  • Defect log export

10. Approvals

Name Role Signature Date
Name Role
Name Role